V&V Activities & Process Models
Verification and Validation (V&V) activities ensure software quality is built-in during each phase of development. This page covers the minimum V&V tasks by phase and testing process models for organizing these activities.
V&V Activities by SDLC Phase
Wallace 1989 defines minimum V&V tasks that should be performed during each software development phase [1]:
Requirements Phase
| Task | Focus |
|---|---|
| Traceability Analysis | Trace requirements back to system concept |
| Requirements Validation | Correctness, consistency, completeness, accuracy, readability, testability |
| Interface Analysis | Hardware, software, and operator interfaces |
| System Test Planning | Begin planning for compliance with functional requirements |
| Acceptance Test Planning | Begin planning for acceptance requirements |
Design Phase
| Task | Focus |
|---|---|
| Traceability Analysis | Trace design back to requirements |
| Design Evaluation | Correctness, consistency, design quality |
| Interface Analysis | Data items and performance at boundaries |
| Component Test Planning | Plan for design compliance, timing, accuracy |
| Integration Test Planning | Plan for functional requirements at stress limits |
Implementation Phase
| Task | Focus |
|---|---|
| Traceability Analysis | Trace source code to design |
| Code Evaluation | Correctness, code quality |
| Interface Analysis | Data/control access across interfaces |
| Component Test Execution | Verify component integrity |
Test Phase
| Task | Focus |
|---|---|
| Integration Test Execution | Subsystem elements and interface requirements |
| System Test Execution | Entire system at limits and stress conditions |
| Acceptance Test Execution | Performance with operational scenarios |
Testing Process Models
A systematic review identified 17 testing process models, most defining 5 maturity levels [2]:
| Model | Structure |
|---|---|
| TMM | Initial → Definition → Integration → Management/Measurement → Optimization |
| TMMi | Initial → Managed → Defined → Measured → Optimization |
| TPI | 20 Key Areas with 4 maturity levels each |
| ISO/IEC/IEEE 29119 | Organizational → Test Management → Dynamic Test Processes |
| TIM | Initial → Baselining → Cost-effectiveness → Risk-lowering → Optimizing |
Five Testing Phases
Most models structure testing activities through five phases:
- Planning — Define objectives, scope, approach, schedule
- Test Case Design — Create test cases from requirements/specifications
- Setup — Prepare test environment and data
- Execution/Evaluation — Run tests and evaluate results
- Monitoring/Control — Track progress and manage deviations
Early V&V in Model-Based Systems Engineering
For MBSE contexts, early V&V checks system design quality before concrete realization [3]:
| Technique | Description |
|---|---|
| Simulation | Model execution, “virtual testing,” co-simulation |
| Model Checking | Formal verification (deadlock, liveness proofs) |
| Manual Review | Engineering reviews applied to models |
| Static Analysis | Program analysis without full execution |
| Model Transformations | Automated conversion between modeling languages (63% of studies) |
Quality Plan Incorporation:
- Treat models as primary artifacts (not just documents)
- Define tooling (Cameo, MagicDraw, Simulink) and interoperability
- Quality gates for models (e.g., deadlock-freeness before implementation)
Agile and Quality Assurance
A common misconception: “I am using an agile approach so my plan does not require quality assurance activities.”
Philip Koopman’s critique (2010) [4]:
“Without an external check and balance it is all too easy to have a process failure.”
The Trust Problem
Koopman argues that Agile relies on a “trust picture” where developers are expected to do the right thing—often at the expense of external audits and objective verification:
| Risk | Description |
|---|---|
| Lack of External Oversight | No independent verification mechanisms |
| Subjectivity of Success | Difficult to determine if team is actually writing quality code |
| Sustainability Risks | Quality depends on individual “hero” leaders—high risk if they leave |
| Auditing Gaps | Audits are not part of typical Agile trust model |
Three Evaluative Questions for Agile Teams
- “Show me the written process you are following” (format can be flexible)
- “Explain to me how an external person can tell whether you are actually following that process”
- “Explain to me how an external person can tell that the process is producing the quality of software you want”
Quality Plan implication: Even Agile teams need defined processes combined with independent quality verification.
References
- D. R. Wallace and R. U. Fujii, Software Verification and Validation: An Overview. in NIST Special Publication 500-165. National Institute of Standards and Technology, 1989. doi: 10.6028/NIST.SP.500-165.
- K. Hrabovská, B. Rossi, and T. Pitner, “Software Testing Process Models Benefits & Drawbacks: A Systematic Literature Review,” arXiv preprint arXiv:1901.01450, 2019, doi: 10.48550/arXiv.1901.01450.
- J. Cederbladh, A. Cicchetti, and J. Suryadevara, “Early Validation and Verification of System Behaviour in Model-based Systems Engineering: A Systematic Literature Review,” ACM Computing Surveys, vol. 56, no. 4, pp. 1–44, 2023, doi: 10.1145/3631976.
- P. Koopman, “Agile for Embedded Software and SQA.” Blog post, December 2010. Available at: https://betterembsw.blogspot.com/